Tuesday, October 5, 2010

October 5 Update On Our New Home

This week we're working with our contractors to apply the finishing touches. The wood floors are in and stained, along with one of two protective finishes.

Now the painters are back cleaning up some loose ends, but they'll return at the end of next week once the floors get the final finish. They'll hang doors and do the final touches on base moulding.

Our cabinets will finally be reinstalled so the counter top guys can draw up their templates for the granite.

I also met with a plumber to install the sink, rework some plumbing (don't need any leaks on the new floor), and install a toilet.

We're still on schedule for an October 23 move thanks to a gang of friends. Anyone in for pizza and keg beer in exchange for some box lifting?


Published with Blogger-droid v1.6.0

No comments: